Complete Retail Store Design & Fit-Out Solutions

From concept to construction — we deliver end-to-end retail design, documentation, and technical compliance aligned with mall standards and your brand vision.

Retail Store Design & Fit-Out Solutions

Complete Design Layouts, Documentation & RAMS

Retail Store Fit-Out & Construction

At Innovative Itec we provide a single, coordinated package that takes your retail project from the first sketch right through to site hand-over—covering concept design, technical drawings, landlord approvals, and full RAMS (Risk Assessment & Method Statement).


1 Concept Design

Define the vision & customer journey

DeliverableDescription
Vision & Experience NarrativeInteractive zones, learning spaces, sustainability features
High-Level FloorplanEntrances, adjacencies, traffic flow, core fixtures
Material & Ambience ConceptsMood-boards, finishes, lighting tone
Area Take-OffsSales, storage, back-of-house, staff areas

2 RD1 – Schematic Design Review (MRD1)

Landlord concept approval

  • Basic floorplan + shopfront elevations
  • Opening treatments, glazing ratios, signage zones
  • Concept finishes & branding cues
  • Landlord focus: compliance, proportions, service layout, architectural intent

3 RD2 – Detailed Fit-Out Review (MRD2)

Construction-ready shell & core

  • GA plans, shopfront sections/elevations
  • Bulkhead, wall-build, structural junction details
  • Partition types with fire/acoustic ratings
  • Review covers: structural tie-in, fire strategy, storefront ratios, corner resolution

4 RD3 – Services & M&E Review

Full integration of building systems

  • Complete MEP drawings—lighting, small-power, HVAC, sprinklers, drainage
  • Connection to landlord risers & BMS
  • Sustainability targets (ISO 14001, waste control, smart energy)

5 RD4 – Technical / Production Design Sign-Off

Fabrication & specification pack

  • Shopfront fabrication drawings, custom joinery, fixture details
  • Finish schedules and product datasheets
  • Load calculations and installation strategies

6 RD5 – Pre-Construction / Pre-Build Review

Everything signed, sealed & site-ready

  • Site access & delivery logistics
  • Hoarding plans, phasing & sequencing
  • Fire strategy sign-off, vertical transport, HSE compliance
  • Final landlord & statutory approvals

Key Design & Compliance Criteria

ItemRequirement
Shopfront Ratios≥ 50 % open, ≤ 20 % solid, ≥ 30 % glazed
Clear Opening≥ 8 ft 6 in (2.6 m) high × 6 ft (1.8 m) wide
Structural IndependenceNo load on mall bulkheads
Fire ComplianceRated partitions, smoke-zone integration
SustainabilityWaste management, energy-efficient lighting & water systems

Phase-at-a-Glance

PhaseCore Focus
Concept DesignVision, layout, materials, flow
RD1 – SchematicShopfront massing, brand positioning
RD2 – DetailedConstruction drawings, partitions, finishes
RD3 – ServicesMEP, sustainability, integration
RD4 – TechnicalSpecs, fabrication, custom detailing
RD5 – Pre-BuildHSE plans, logistics, final approvals

RAMS – New Retail Store Project

(Risk Assessment & Method Statement)

1 Project Details

ItemInfo (to complete)
Project TitleNew Retail Store Fit-Out / Construction
Location
Principal Contractor
Start Date
Duration
Site Contact

2 Scope of Works

  • Internal fit-out: partitions, flooring, MEP, ceilings, signage, finishes
  • External signage & minor façade works (if required)
  • FF&E procurement and installation

3 Method Statement

SequenceKey Activities
Site SetupDeliver plant/materials, erect signage/hoarding, establish welfare
Strip-Out / DemolitionRemove existing finishes under H&S & environmental regs
MEP InstallCable containment, wiring, HVAC ducting, plumbing; testing & commissioning
Partitions & CeilingsMetal/timber framing, plasterboard, suspended ceilings
FlooringSub-floor prep, tile/carpet/vinyl install
DecorationPainting, brand feature application
Signage & ExternalFit internal/external signs, make-good entry points
FF&EAssemble shelving, counters, POS
Final Clean & CommissionBuilders’ clean, snag list, fire alarm & HVAC balancing

4 Risk Assessment Summary

HazardRiskControls
Working at heightFallsTowers, harnesses, edge protection
Manual handlingBack/hand injuryTraining, trollies, lifters
Electrical workShock/fireCertified electricians, LOTO
Dust & noiseRespiratory/hearingMasks, ear defenders, extraction
Power toolsCuts/eye injuryPPE, pre-use checks
Slips/tripsSprainsHousekeeping, cable mats, signage
FireBurns/smokeExtinguishers, evac routes
Public interfaceThird-party injuryHoarding, access control
Lifting opsCrush injuryLift plan, banksman, certified crane crew

5 PPE Requirements

Hard hats · Hi-vis · Steel-toe boots · Gloves · Eye protection · Hearing protection* · Dust masks*

*As task requires

6 Emergency Procedures

  • First Aid Point: [location]
  • Nearest Hospital: [details]
  • Fire Assembly Point: [location]
  • Site Emergency Lead: [name / contact]

7 Training & Competency

All site personnel must hold:

  • Valid CSCS (or equivalent) card
  • Site induction attendance certificate
  • Task-specific tickets (e.g. PASMA, IPAF, Manual Handling, Asbestos Awareness)

8 Environmental Measures

  • Segregated waste via licensed carriers
  • Noise restricted to agreed hours
  • Dust suppression in sensitive areas
  • No unnecessary idling of plant/equipment

Ready to Build?

With Innovative Itec you receive a fully coordinated design package and a robust, compliant RAMS—removing guess-work, de-risking construction, and keeping your programme on track.

Let’s turn your retail vision into reality—safely, efficiently, and on brand.